Engineering Construction Machinery Trailer Concrete Pump

Engineering Construction Machinery Trailer Concrete Pump

CZPT CZPT CZPT Trailer Concrete Pump

 

Max. concrete output for pump 40m3/h
Energy Diesel gasoline engine
Max. combination measurement for pump 30mm
Max. combination measurement for shotcrete 15mm
Engine electrical power 85kw
Efficiency for shotcrete 7m3/h
Concrete spray length 100m
Air compressor Optional
Max. shotcrete length 50m
doing work air stress .four-.6Mpa
Air compressor Optional
Bodyweight 3500kg
Overal size  5300mmx1500mmx1700mm
Concrete express horizontal distance 500m
Concrete convey vertical peak 150m
Diesel engine CHANGCHAI
Hopper capacity  0.3m3
Concrete slump  12-18cm
Feeding height 1100mm
Oil capacity 100L
resilience ratio

ten%

 

 High operating efficiency: hydraulic pumping variety, high technique trustworthiness, secure conveying potential.Can be utilised for grouting, filling, grouting, pumping and other construction. Continually adjustable injection amount: variable plunger pump is adopted for the major oil pump, and the injection speed can be freely modified (the greatest amount of switching adjustment sum shall not be much more than sixteen occasions /min). The additive quantity of accelerating agent is continuously adjustable: it can be constantly modified in accordance to the volume of shotcrete. Long provider daily life of donning elements: the support daily life of sporting areas of the main motor is not significantly less than 4000m3 of injection.

 

Trailer Concrete Pump, as properly identified as concrete pump, it was composed of pump entire body and delivery pipe. It was a kind of machine that use pressure to continually transport concrete together the pipeline, which was mainly utilised in the development of properties, Bridges and tunnels. It was mainly divided into gate valve concrete pump and S valve concrete pump.
Big Trailer Concrete Pump, utilised for tall properties, substantial-velocity, flyover and other big concrete engineering concrete conveying work.It is composed of pump body and conveying pipe.

How to use the Trailer Concrete Pump

  1. the  Trailer Concrete Pump should be put on a strong and flat ground, with the supporting legs down and the fuselage placed smoothly.
  2.  check before operation to make sure that the electrical products and instruments are regular, the switch buttons and take care of of all areas are in the proper placement, the fastening points of the mechanical component are organization and dependable, the tightness of the chain and belt fulfills the specified needs, and the transmission portion operates usually.
  3. the concrete conveying pipe joints shall be tightly sealed and the pipe clips shall be firmly connected.Vertical pipe should be no significantly less than ten meters in front of the horizontal pipe with a examine valve, it was strictly prohibited to link the vertical pipe straight to the concrete shipping and delivery pump outlet.
  4. when dredging the blocked pipe, individuals all around ought to be evacuated.Ahead of disassembling and cleaning the pipeline, backpumping strategy need to be adopted to take away the force of the conveying pipeline.It is strictly forbidden to pipe mouth to individual when disassembling.
  5. Please not get rid of the hopper grid and other safety products in the course of procedure. Did not climb or ride the conveying pipe,  not set your hand into the valve physique to function,  not eliminate the pipe when pumping.
  6. when cleansing the pipe, the operator should go away the pipe outlet and bend joint.When cleansing the pipe with compressed air, no one and products shall be authorized in 10 meters of the pipe outlet.

7) right after the procedure, unload the hydraulic system and return all the management switches to the authentic place.
Piping layout Portable Concrete Trailer Pump
The concrete delivery pipe shall be arranged in accordance to the characteristics of the venture and construction internet site and the concrete pouring plan. You should shorten the size of the pipeline, much less elbow and hose. The laying of supply pipe must make sure safe development, aid cleaning pipe, troubleshooting and set up and disassembly routine maintenance.
Concrete supply pipes of the same diameter shall be used in the same pipeline. When the new and 1-working day sections are adopted at the same time, the new pipe should be organized at a spot with greater pumping pressure. The pipeline should be organized horizontally, horizontally and vertically. A schematic drawing of pipe layout shall be drawn, the technical specs and quantities of different pipe fittings, pipe connecting rings and elbow pipes shall be outlined, and a checklist of spare components shall be proposed. The concrete supply pipe need to be selected in accordance to the optimum particle dimension of coarse aggregate, the type of concrete pump, the delivery length of concrete output, and the degree of conveying trouble. The shipping and delivery pipe shall have a power suited for pumping circumstances.The pipe section CZPT crack, bump and bend should be utilised. Pipe joints shall be limited, powerful ample to be speedily assembled and dismantled. When the least pipe diameter of conveying pipe is lOOmm, the maximum particle dimension of coarse mixture are not able to exceed 30mm, and when the bare minimum pipe diameter is 125mm, the highest particle size can’t exceed 40mm. When piping vertically upward, the size of horizontal pipe on the ground shall not be significantly less than one/four of the size of vertical pipe, and shall not be much less than 15m, or comply with the provisions of the item specification.A globe valve shall be set at the root of the conveying pipe at the y-formed pipe outlet three ~ 6m of the concrete pump to prevent the backflow of concrete combination.When pumping underground buildings, the horizontal pipe axis on the floor ought to be perpendicular to the y-shaped pipe outlet axis.When inclined downward piping, exhaust valve must be established at the upper conclude of inclined pipingWhen the height difference is increased than 20m, a horizontal pipe with 5 times the peak distinction length should be established at the reduced conclude of the inclined pipe.If the issue is limited, the elbow pipe or ring pipe can be additional to fulfill the necessity of 5 occasions the height big difference length.The fixation of concrete conveying pipe shall not be directly supported on steel bars, formwork and embedded elements. Horizontal pipe shall be set with bracket, platform pad and sling at a specified length, so as to remove pipe blockage, put in, dismantle and clear the pipe.The vertical pipe must be mounted in the hole on the wall and the column or the roof of the flooring with embedded parts.In the wall and column, every single section of the pipe need to not be significantly less than 1 mounted level, in each and every ground slab holes need to be fixed. A bend at the lower stop of a vertical pipe must not be used as a assist point for an higher pipe.Suitable for steel assistance to bear the bodyweight of vertical pipe.When the vertical pipe is fixed on the scaffold, the scaffold can be strengthened as needed.There shall be no leakage of slurry at the clamp of pipe joint.In very hot year construction, it is advisable to cover the concrete conveying pipe with wet fabric and warm straw bag to avoid CZPT.CZPT in chilly period, it is recommended to use insulation supplies to cover the kungfu soil conveying pipe, to avoid the concrete inside the pipe from freezing, and to guarantee the temperature of concrete into the mould.When the horizontal conveying length is much more than 200m, the vertical conveying length is far more than 40m, the conveying pipe is vertically downward or the horizontal pipe is organized in front of the inclined pipe, when the cement usage for every device of kungfei soil mixture is considerably less than 300kg/m3, the piping approach and pumping procedure have to be fairly picked, it is recommended to use large diameter concrete conveying pipe and prolonged conical pipe, and less elbow pipe and hose.When the conveying height exceeds the maximum conveying length of concrete pump, relay pump (successor pump) can be utilised for pumping.In addition, in accordance to the qualities of engineering structure, design technology, cloth specifications and piping problems, the choice of fabric gear.The distribution products shall be arranged according to the dimensions of the structure aircraft, the piping situation and the duration of the fabric rod, and it shall go over the entire framework airplane, and the fabric shall be dispersed evenly and rapidly. The distributing tools need to be firmly and stably put in.

one.Electrical power system Trailer Concrete Pump

CZPT oil pump: Germany CZPT or Japan Kawasaki are adjusted. Diesel energy: Germany Deutz, Weichai, Schneider, Japan Siemens, Mitsubishi are adjusted. The major electrical power could be adjusted by the person

2.Electronic control system Trailer Concrete Pump

Japan Mitsubishi Programmable Logic Controller (PLC) digital manage program. Primary electric aspects are imported first Schneider, Siemens, OMRON, LG and so forth. The management manner: handbook procedure and wi-fi remote handle Xihu (West Lake) Dis.nity and intelligent electronic handle program optimizes the particular person-machine interface.eight-electronic pumping time accumulation timer supplies exact knowledge for the user, Computerized anti-pump perform and optimized software layout. Automatic difficulties monitoring purpose.

three.CZPT system Trailer Concrete Pump

The special open hydraulic program and hydraulic cushion technologies contribute to the more compact exchange affect and less heat of the system. In the meantime, with the popular brand of principal pump and hydraulic valve, the basic safety and dependability of the concrete pump are assured. The hydraulic pipeline selects the high efficiency seamless steel pipes and all pipe joints and large stress hoses are of the well-known makes. A number of high strain accumulators and their outstanding cushion efficiency lessen the necessity of S pipe vale for the concrete. The concrete is delivered freely.

4.Pumping system Trailer Concrete Pump

Pumping displacement variable adjustment: Change the pumping displacement in accordance to the development to meet the necessity of the issue. Decreasing style of the hopper could launch the minimizing pressure of the concrete into the shipping and delivery pipe maximally, and lengthen the support lifestyle of the S pipe outlet.

five.Lubrication System Trailer Concrete Pump

The patented central automated lubrication system will come with a piston grease-pump, characteristics high strain and trustworthiness, which can understand automatic lubrication of piston. The filters at the outlet and the inlet of oil ports as double protections assure the system reliability.

6.Cooling System Trailer Concrete Pump

Obligatory air cooled heat exchanger keeps the temperature of the hydraulic oil under sixty diploma,that ensures the complete hydraulic technique performs at regular position.

Business details:

Taian Xihu (West Lake) Dis. Device Manufacture Co., Ltd. is the professional manufacture in China, Lic. No. 913709006140867770 We Focus in theelectric concrete stationary pump, concrete mixer with pump, truck-mounted concrete pump. Our Mission is to constantly give exemplary service to every and every single customer. 
We operate to create long-time period, mutually advantageous relationships with our personal sellers, sellers and concrete pump customers. Our success depends upon the accomplishment of our buyers! 

Why choose XIHU (WEST LAKE) DIS.? 
XIHU (WEST LAKE) DIS. Concrete Pumps offers outstanding engineering with substantial high quality craftsmanship and style in every concrete pump that is using all more than in the entire world. All of our concrete pumps are developed and assembled with the owner and operator in brain. With no complicated computer methods, our concrete pumps supply operator pleasant controls that are straightforward to realize and will aid full your task on time with trustworthiness. 

When you buy a XIHU (WEST LAKE) DIS. shotcrete sprayer, you get over twenty a long time of stop user knowledge with our sector leading assistance/service network. We provide globe course items and providers, environment the requirements for top quality through steady and significant investment in research and growth. We offer our clientele with advice and help ranging from the right decision of machines to be used for a construction venture to engineering options. Our machines are utilized for a range of applications like civil engineering, mining, tunnelling, pre-forged factories, big scale industrial tasks and energy stations. We take care of all kinds of assignments, irrespective of scale or remoteness of location. 
We mix top stop German engineering, technological innovation, skills and large production requirements with locally related specifications to supply a comprehensive remedies bundle. In 1999 we ended up 1 of the initial design equipment, Companies to obtain ISO 9001 certification adopted by 9001/2000 certification in 2005. 

“It is our objective to make certain that the operate we do at our overseas trade enterprise is exceptional and that protection is a priority on all our jobs. We worth our buyers, and do our best to meet up with all their needs. We stand powering the work we do, And we are fully commited to the clients we serve” ——Michael Cheng

 

 ————————

Michael Cheng
Mobile :  15066732571
 
Taian Xihu (West Lake) Dis. Equipment Manufacture Co., Ltd.

Engineering Construction Machinery Trailer Concrete Pump

Tags

drive chains

As one of leading drive chains manufacturers, suppliers and exporters of mechanical products, We offer drive chains and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of drive chains.

Recent Posts